Winter 2015 I have pushed forward with design and making of the vege garden area. A lot of thinking it through- measure twice cut once.. and wood isn't cheap.. Great to get a digger in there to help carve out whenre the steps will be cut into the path. In time shredder cuttings from the native tress I have around will be used as mulch and coverage on the steps so its soft/ spongy and suppresses weeds and uses environment to best effect. One of the photos I have marked out where a barn hopefully will be in time( off to the right as curving down the driveway- 3 by brn with 6 metre depth- handy for tools, boat,trailer, firewood, etc in time
Also have signed off new build over winter with my complete design which willlook something spectacular- mono pitch, black and rockcote cladding, all lounge and all rooms stacker doors opening out into courtyard. Build Starts March 2015 and scheduled completion Sept/ Oct 2015. The steps willcontour down to a rear courtyard that flows into the living area and out to courtyard before steps pull out again the flow and curve further down the property through more lavenders, Cyprus and colour to the native trees below
No comments:
Post a Comment
Note: only a member of this blog may post a comment.